Skip to main content

Finished laying track on the bench work connecting the two reversing loops. Installed 10 Tortoise switch machines today and had a successful test run.  Still need to install the IntuiSwitch turnout controllers.

 

The first two photos give an over view of the layout room.  Center area where wood is stored will be a large peninsula.

 

28 oct7l

 

28 oct7r

 

 Looking back at the half wall.  The nearby track has a serious grade and will limit train length unless double headed or doubling the hill...

28 oct5

The far right corner

 

28 oct4

The far left corner

28 oct2

Attachments

Images (5)
  • 28 oct2
  • 28 oct4
  • 28 oct5
  • 28 oct7l
  • 28 oct7r

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×