Skip to main content

Add even more interest and operating options by moving 'Hand Car' track D inside of the second largest loop and connect largest loop to second largest loop with 2 pair of switches at the top of the layout.  That way either train could traverse the two largest loops AND enjoy a direction reversal.  Just remember to isolate these two loops from one another at the paired switch junction points with fiber pins.

 

Suggestion #2, terminate the whimsical trolley end to end route with an 'Engine House' or something similar at each end and you'll 'hide' the bumper!

 

Best,

Dave

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×