Train Room 12/21/2018 update

Mike WOW I had to go looking for this thread.. I dont wonder much from the high rail area!   Amazing work!  Very good thread!  15 pages of fun, drama, decisions, and outcome!    Glad you mentioned it in another post!   Cant wait to see what comes next! 

Jim

Operator of the Southern Railway System.

Powered 100% on DC.   

Good morning everyone, I thought I would give a little update before Christmas. It has been a slow haul but I am still moving forward with a couple back steps here and there, but its all good! As you all can see I got the road bed laid for my outer loop. and was able to get some track down.20181207_14443520181207_14444120181209_152131

As you can see in the pictures below I redesigned my airfield to 1 1/2" foam with a plywood base for it. I realized after removing the foam that was there a few times to get access to the track it was a PIA, this is much better as I can reach in from the center if I have any problems. I also took the idea given to me from Paul2 and moved the runway over the tracks on the front and will add tunnels. Gives it some excitement!

20181211_09494620181214_09360320181214_093612

Last but not least I was able to get my first switch installed and part of the upper loop laid. Mr. Fedx came yesterday with another switch, so I hope to get that in today and finish the upper loop. I also was able to put power to the track I have laid and run a small train up and down the 25' of track I have up so far! Here is a Train Room tour video. I had to cut it in half to fit on the forum. Enjoy!

I hope you all have a wonderful Christmas and a great New Year!

 

Mike

USMC 5/11 Battalion Oscar Battery 155 Big Guns!

Semper Fi !

Menards addiction Meeting member! /  LCCA# 41824

Attachments

Photos (10)
Videos (2)
Train Room# 1
Train Room# 2

Thanks Guys, don't know if I will get anything done today, had a wind storm come threw yesterday and have to clean up the yard before the kids get here for Christmas!

Mike

USMC 5/11 Battalion Oscar Battery 155 Big Guns!

Semper Fi !

Menards addiction Meeting member! /  LCCA# 41824

Hi Timothias, Thanks! Yep that's 1/2" ply wood with supports at 16" on center. It holds my 190Lbs! LOL

Dave, I could not have got this far without you and Carl, among others!

Dr. Joe, I am glad you liked the video!

Bob, if I have 2 loops running by spring, I just might forget about the lawn!

LARRY SR. I want to say a special thank you to you! I would have never had an airfield if it wasn't for you and your layout! When I started this whole thing you were there with such support and insight! Semper Fi my brother Marine and my you and your Family have a wonderful Christmas!

Mike

USMC 5/11 Battalion Oscar Battery 155 Big Guns!

Semper Fi !

Menards addiction Meeting member! /  LCCA# 41824

Nice Mike! Layout is really turning out really nice! I thought the airfield was good before, but I think the changes were a great idea and it looks even better now, nice improvement.  And that bridge is something else too. That's really a great feature. I would probably just sit and operate the bridge up and down all day, or go back and forth from train room to garage just to see it work! 

Thanks Guys!

RTR I better thanks and I better talk to Tank as I have not seen any money from his modeling ! LOL

SOUTHERN4501 Thanks, Just let me know how I can help you out with your bridge lift!

Mike

USMC 5/11 Battalion Oscar Battery 155 Big Guns!

Semper Fi !

Menards addiction Meeting member! /  LCCA# 41824

Thanks Mark, the bridge lift took me a few times to get it right! I probably wasted a full sheet of plywood until I got it where it is now!

Mike

USMC 5/11 Battalion Oscar Battery 155 Big Guns!

Semper Fi !

Menards addiction Meeting member! /  LCCA# 41824

Great work Mike G. It's all coming together nicely! Your lift bridge works and looks great, along with your elevated line, grades, and the tunnel under the airfield is going to look cool, I think!

Rusty

And as the sunset faded, I spoke to the faintest first starlight.
And I said next time, Next time, We'll get it right!

Thanks Rusty! It sure is fun building it, I just wish I had all the supplies I need instead of going form payday to payday. But that's ok I find other stuff to do on the layout that doesn't cost me anything. I have a lot of scraps to build stuff!

Mike

USMC 5/11 Battalion Oscar Battery 155 Big Guns!

Semper Fi !

Menards addiction Meeting member! /  LCCA# 41824

Great Job Mike! I am also looking to do something similar if not exactly like your bridge.  Love the airfield and elevations of the loop area. All is nicely integrated!

Have a Merry Christmas and enjoy the journey! A couple of years ago I built a stand alone wood fired brick oven in our back yard. Couldn't wait till Pizza's and bread starting coming out of it. After the build was finished I loved the food but also missed the building. Had lots of help from a brick oven forum and made some new friends which was better than any pizza or bread. The pizza was fantastic, but the friendships were better. Again, enjoy the journey!

no matter where you go...there you are....

AEGIS21, I could not agree more! The build is a great adventure for me. I have always been into wood working, but the track laying and wiring are all new stuff to me. It's really a challenge for me, but that is part of the journey! The feeling you get when you make something work is almost like Christmas! I hope you keep fallowing and post your layout so the rest of us can share in your enjoyment!

Merry Christmas and Happy New Year! May it involve lots of train stuff!

Mike

USMC 5/11 Battalion Oscar Battery 155 Big Guns!

Semper Fi !

Menards addiction Meeting member! /  LCCA# 41824

mike g. posted:

Good morning everyone, I thought I would give a little update before Christmas. It has been a slow haul but I am still moving forward with a couple back steps here and there, but its all good! As you all can see I got the road bed laid for my outer loop. and was able to get some track down.

As you can see in the pictures below I redesigned my airfield to 1 1/2" foam with a plywood base for it. I realized after removing the foam that was there a few times to get access to the track it was a PIA, this is much better as I can reach in from the center if I have any problems. I also took the idea given to me from Paul2 and moved the runway over the tracks on the front and will add tunnels. Gives it some excitement!

Last but not least I was able to get my first switch installed and part of the upper loop laid 

Beautiful craftsmanship, Mike! From the perspective of us, who have neither the experience nor the skill to do what you have done, it would be  a boon to know what unexpected challenges you faced and how you solved them. Might steepen our learning curve.

Peace, Joy, and Merry Christmas to you and yours!

Pete

Pete F.

Mahwah, NJ

TCA# 18-73568

Hi Pete, as I stated before, I know wood working, I don't know electrical! But with the help of many here I am learning and still asking a lot of questions! I am sure when it comes to doing landscape I will be asking a lot more questions! I am pretty much a newbie as this is my second layout. I got into trains when I turned 45 when a friend next door was moving and gave me his train set. Granted it was HO but it was a start! For me it may take longer to do stuff but that's ok its the adventure of doing things the best I can!

Merry Christmas to you and your family!

Mike

USMC 5/11 Battalion Oscar Battery 155 Big Guns!

Semper Fi !

Menards addiction Meeting member! /  LCCA# 41824

Add Reply

Likes (18)
Aegis21Fridge56VetnmtrainsKnobKneeTelevueTShearerLarry Sr.Putnam DivisionRoger WassonBig_Boy_4005RadCambriansilvermustangRSJB18trainroomgaryMark BoyceEngineer-JoeMenardscabinet Bob
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR


OGR Publishing, Inc. PO Box 218, Hilliard, OH 43026 330-757-3020
www.ogaugerr.com
×
×
×
×
×