Skip to main content

I started applying Roberts Brick Mortar on my new MTH Heartbreak Hotel.  Started building a new Clever Model's structure, just waiting for my lights to show up from China. Started scenicing a yard area on the layout.  I am going to work on another Clever Models Structure tonight and probably weather the Hotel and a Lionelville structure.

 

IMG_4036

IMG_4037

IMG_4035

Attachments

Images (3)
  • IMG_4036
  • IMG_4037
  • IMG_4035

Stared at it, daydreamed, coughed 23 times, ran out of Kleenex, returned downstairs for more meds and water and to continue rassling the recliner

 

So, the answer is I did nothing to the layout. But I will catchup.

[there is no bacteria on this post---cough, cough].

 

 

Some mighty good looking work shown up above.

I put together a dummy K-line MP-15 today.

Last Tuesday a friend showed up at my layout with 2 K-line Alco FA's and 2 K-line EMD MP-15's. Only 1 FA would run. By the end of the day I improved the Alco FA that would run. Replaced the E unit in one of the MP-15's with one that I had, Installed the trucks from the damaged MP-15(broken shell) on to the second FA. Just like the 1 to 1 scale railroads we had to do some cutting on EMD trucks to get them under the Alco FA.

For my repair work my friend gave me the MP-15 frame and the broken shell.

Today installed Lionel dummy trucks under the MP-15 frame and added my good non-damaged K-line shell to make a new dummy engine. The engine will go to the paint shop in the near future. For now it looks like "Johnny Cash" built it. 

All I did on today on my portable O-gauge layout was look at it because I am working on some N-scale projects right now.

 

I got the painting and track completed over the last few weeks. The weather is going to be great this weekend and I have three days off, so I will get a good start on the scenery starting tomorrow.

Making a switch control panel out if oak. It will control 16 turnouts. Indicator lights will be tiny LEDs. Keeping it very small so it tends to blend in with the layout front. I  have Legacy control of the switches also. These are just for fun.  Using different color LEDs to represent different areas for turnouts; such as yards, crossovers, coaling area. Routes will light with different LED colors which I'm hoping my mind will recognize after using for awhile which patterns set which routes. Time will tell. Just blew first try by drilling one hole out of place. I'm staining and sanding second attempt now.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×