Skip to main content

5/7/2020 Update

I was sidetracked from the layout for a little while but I'm back working on it.

I've finished the benchwork and painted it.  I've started to place the track to see how the design turns out.  I have to stop by my storage unit to pick up some bridges and after the track and bridges are fully placed I'll install the roadbed and then screw it down.

Then the big decision will be "What to run 1st"?  Of course they'll be a thousand things to go after that but I really want to give it a whirl!

Untitled_Panorama-220200507_18565420200507_185642

 

 

 

 

Attachments

Images (3)
  • Untitled_Panorama-2
  • 20200507_185654
  • 20200507_185642
Last edited by Chris Lord

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×