Skip to main content

"HONGZ" stands for HO scale, N scale, G scale, and Z scale.

Post your non-O scale stuff here!

I'm putting my waterfall back together after the liner failed. I got around ten years out of it. I put in a new one and did some extra work to protect it. I still have a bunch of rocks to stack. I wanted to see how the water flowed on the rocks placed so far.

DSC_1401DSC_1403DSC_1404



Every year this area sees some settling of the road bed. I want to pour concrete base to stabilize it better. It's not that big of a job but getting the curves correct takes some effort. I've added ballast about four or five times now and re-leveled it. I have concrete in other areas that has worked out well.

The real issue is that I want to redo the whole layout and possibly make it into a folded dogbone for more interest than just running around the perimeter of the yard.

DSC_1405

This job never ends!!

Attachments

Images (4)
  • DSC_1401
  • DSC_1403
  • DSC_1404
  • DSC_1405
Last edited by Engineer-Joe
Original Post

Replies sorted oldest to newest

I'm putting my waterfall back together after the liner failed. I got around ten years out of it.

Every year this area sees some settling of the road bed.

This job never ends!!

...just like on the 1:1 railroads...fighting Mother Nature 24/7/360.

Which is one of the 'joys' of outdoor railroading! 

If you're not into maintenance of ROW, grooming of landscape, competing with invasive flora/fauna, etc., etc., blah, blah, then Grosse Bahn is definitely not your branch of this wonderful hobby.

OTOH...When you're off to the beautiful start in these photos, clearly you're hooked!

WELL  DONE!!!

Keep us posted!  Love it!!!

KD

had a short halt operations. It was another Aristo micro-switch for the frog that had shorted. It connected both rails together!

I had removed the small poly fuse that connected the switch to the frog. That didn't help here. Took some time to find the short as I blamed an engine first. Replaced the 2 Challengers with diesels and blew another fuse. So I had to look elsewhere.

I will run this season! even if it killllllllll, well I will run.

I put the old siding back in, this time on concrete. It's smaller now because of the privacy fence blocked some of the space.

DSC_1421

DSC_1422

I also have a new plan for a 3rd loop that will circle around the shed. It will allow for the building up of a train without fouling up the main. The inner most siding track will switch off here to create that loop.

More work ahead.

DSC_1423

I may also change the whole design to a folded dogbone.....

Attachments

Images (3)
  • DSC_1421
  • DSC_1422
  • DSC_1423

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×