Skip to main content

I have my lay wired for 2 trains now.A powered siding so I can have one train pull into a siding.And then have the other train take the main line.Well the train gets to the switch and shutdown.So I tryed a different a locomotive same thing happened.So what can I do do to fix this?I have to go out for a while but please leave your replys.And as always any help I will be very greatful.

Original Post

Replies sorted oldest to newest

Originally Posted by Pine Creek Railroad:

sbs,

   You will need to give us a little more info before we can help you, are you running Legacy/DCS or conventional, do you have toggle switches for your sidings and what track & switches are you running?

PCRR/Dave


Well I operate conventional and I have one toggle switch.For one power siding and I have gargraves and some atlas o gauge track.

Originally Posted by Moonman:

The red dots near the switch on the center rail before the first curve at each end is where an insulating pin or joiner needs to be. Then when train one pulls in, you kill the power to the siding.

I have already have your picture here.I have saved it in my pictures.I followed your directions every thing is fine.I just now looked at the switch and noticed rust and
corrosion on the sides of the rails.I may have to find a way to clean it.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×