Skip to main content

Reply to "GOING INTO PRODUCTION...Controlling DZ-2500C switch machines at a panel with a momentary push button and a red and green LED"

Board was revised to use screw down connectors; 

 

Holes were added to facilitate wiring the center set of connectors; and a second power connector was added to facilitate daisy chaining the boards with a single power source.

Wiring from the DZ-2500s  and power source would look like this:

 

However, because of the Chinese Dragon Boat Festival, the production has been delayed to this Sunday. It will take 2 weeks to complete the 10 boards.

Attachments

Images (3)
  • mceclip0
  • mceclip1
  • mceclip2

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×