Skip to main content

i decided I was building a 1 lane dogbone layout so I can run trains and still have space in my house. In the middle of the layout I am putting a newer black version of the bascule bridge but com to find out my gg1 is not going to make it through. What has others done to get around this. Help please I was thinking on the circle end of the bone I would put a second switch to bypass the bridge but if that switch is forgotten and train goes through say by to pantographs. here is the start of the frame

Attachments

Images (2)
  • image
  • image
Last edited by bigdogjeff1
Original Post

Replies sorted oldest to newest

Ask gunrunnerjohn or stan2004 to provide a circuit and components for a loud bell or other audio alarm with lights on the approach tracks to the bascule bridge that triggers a reed switch with a magnet on the GGI and is turned off or never actuated when the diversion switches are set to avoid the bridge.

 

Question:  will a LIONEL GG1 safely traverse the bascule bridge with the pantographs down?    

Originally Posted by Pingman:

Ask gunrunnerjohn or stan2004 to provide a circuit and components for a loud bell or other audio alarm with lights on the approach tracks to the bascule bridge that triggers a reed switch with a magnet on the GGI and is turned off or never actuated when the diversion switches are set to avoid the bridge.

 

Question:  will a LIONEL GG1 safely traverse the bascule bridge with the pantographs down?    

That's a great idea if it would work thanks

Obviously the only real issue here is running with the pantograph(s) up.  Otherwise there's loads of headroom through the 313 for a GG1 with the pantographs down.

 

Solution: Build 3 sections of catenary on both approaches and through the bridge.  Have the fake live wire height at either approach begin higher than the raised pantograph and slowly dip to just below bridge height clearance.  The live wire will push down on the pantograph on approach allowing it to clear without fully collapsing and then raise again once the engine has passed through.  Of course the middle section of live wire attached to the bridge structure will need to be separate from either end so that the structure can still be raised.

 

Fun project....one I plan on doing for my fleet of GG1's anywhere there are low bridges, overpasses and tunnel portals.  I'll probably end up having the entire layout under wire eventually.

 

Bruce

Last edited by brwebster

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×