Not much happening since the last update........final sign off occurs after the windows are finished and painted, the walls are touched up and a terminal cleaning is done.

No worries though, the additional Mianne Benchwork is on order and the likely arrival is sometime after Labor Day.

I finally settled on a plan and this is it.....the Mianne Benchwork allows for some overhand and I expect it to be about an inch and a half all the way around.

The lift section will be in the middle in the area marked b, c, d, with the open area above it.

Ignore the sidings on the bottom outside the main layout proper for now....they are alternatives to what is already on the plan.....

There is a minimum of 3-4 feet all the way around the layout.

69C97100-CF09-4FDB-BFBC-E4F22C3CDBCA

The wall on the right (the east wall) is wired for a flat screen TV which my kids gave me for Father's day....

E56D57D2-5B24-4545-9E21-0E574929C86246CEC745-4C5B-4C2E-BFB4-CB271D6CE85BEECF7A83-CC17-4046-A741-FD331E45DFFF

A big plus.....when the house was built, the whole house vacuum was extended to the attic.....I just had it  serviced and there are two accessible ports in the layout room.....

86F3159C-8BA5-40FE-8C92-A7765CFC8E59

This is the storage room where are the train boxes will be stored.....

8C3B056F-9517-426A-B2A8-6D8B15F3D738

Once the touch up paint is finished and the place cleaned, the next step is to empty the storage units into the storage room.......then we'll be ready for the Benchwork!

The track order will probably be for York pick up.

One of these days I'll ask Tom (Gilly@N&W) to help me estimate how many Glen Snyder shelves I will need (also, for York pick up)

I suspect the next big update will be after the trains are moved in.

Have a great summer everyone......

Peter

Attachments

Images (6)
  • 69C97100-CF09-4FDB-BFBC-E4F22C3CDBCA
  • E56D57D2-5B24-4545-9E21-0E574929C862
  • 46CEC745-4C5B-4C2E-BFB4-CB271D6CE85B
  • EECF7A83-CC17-4046-A741-FD331E45DFFF
  • 86F3159C-8BA5-40FE-8C92-A7765CFC8E59
  • 8C3B056F-9517-426A-B2A8-6D8B15F3D738
Last edited by Putnam Division

Peter, John has an excellent point!  I too would be happy with the storage room for my layout!  You and your wife have worked really hard all these years bettering countless patients’ quality of life and even length of life.  You really deserve a fantastic space for a layout!  It sounds like you will need a big vehicle to haul the track and shelving back home from York!  😄

That is certainly a magnificent space for the layout, I think I'd be happy to build my layout in your storage room!

One comment, maybe consider more yard space?  I know I wish I had planned for more.

I hear you, John.....I will. In addition, I will also have floor to ceiling Glen Snyder shelving (somewhere between 90-100 6ft sections) as ready tracks.

My goal is to have everything out and available to run.

Peter

Last edited by Putnam Division

I hear you, John.....I will. In addition, I will also have floor to ceiling Glen Snyder shelving (somewhere between 90-100 6ft sections as ready tracks.

My goal is to have everything out and available to run.

Peter

Ditto for me.  I have around 140 feet of Glenn Snyder shelves now, and I'm prepping an 18 foot wall that will be floor to ceiling shelves, looking like 45 six foot sections.  I will probably also put some more over my under construction freight yard as well, that would be another 14 six foot sections.

I'm really looking forward to having stuff out where I can see and enjoy it, and also run it.

As expected, a very quiet summer as far as the new layout is concerned.  I await the materials.....and, the River City 3 Railer's current revision/refreshment projects on the 21x42 modular layout are keeping me very busy.....

Monday, Sept 20th, the storage units get emptied.

Sometime after Labor Day, my Mianne order will be ready and then shipped......it can come whenever, since I'm in  no rush......this is a once in a lifetime project for me......

Track plan set....ordering track and Glen Snyder shelving, soon....

I have moved my "train library and videos" to the attic shelving......and, my current stock of Mianne benchwork has been carried to the attic.....

35D466C4-BCF8-432D-AF62-603B83A30D6E

....i suspect that many of these books and videos are familiar to the group......

A967D5D6-0874-44B6-98C8-AC068361B93B850A9115-70CD-4E1E-8690-F738D40D237F

Have a safe and great rest of the summer, folks......

York or Bust, October 20201.......

Peter

Attachments

Images (3)
  • 35D466C4-BCF8-432D-AF62-603B83A30D6E
  • A967D5D6-0874-44B6-98C8-AC068361B93B
  • 850A9115-70CD-4E1E-8690-F738D40D237F

The trains came home today......I had the storage units emptied.....3 poor fellows had to do it.....but I tipped them well and they were very happy....

Loading at the storage facility:

4F12A085-E731-4E60-8291-6A8CED65A842F3B2D40C-CE5B-41EB-9CD5-A75B5C0A6F70

The two 10x10 units are now empty......

CE9EFDCC-09DF-4382-8920-3A5DC3DCB9EBF966065A-9BB9-4CB7-AEF9-4BB5570FF8E9

Going home with views from the attic:

9DBD814B-94E8-4ECD-A22B-1C1FAF4B4B81

The stuff on the far end belongs to my kids.....

524F1237-B7A3-4855-9876-9BCC0292C6B0

A few views "from the attic window" are provided to track progress......

00A002FE-B364-4609-8B0D-CD8E9C7A665B49064643-431C-442E-AF30-65FDACB11A0CDE4C3A62-197C-4AAB-8197-6FFAC0F02ED2AF50B7D2-B547-49D6-83FD-368F0C4872468BDA3BBF-EA9C-43FB-A687-8E454CA2B741346CE767-B78B-440F-973D-A57A21C2FD0D85CB8924-71B3-449A-B2A6-4B2011126BEDB4CC81E9-7C61-451B-85F8-389C781E09E8092A1F9D-A6D6-4DED-8491-C8EFED6DE833

A major step in the new layout has occurred........and, at the very least, my trains are now available for our upcoming holiday displays!

Peter

Attachments

Images (15)
  • 4F12A085-E731-4E60-8291-6A8CED65A842
  • F3B2D40C-CE5B-41EB-9CD5-A75B5C0A6F70
  • CE9EFDCC-09DF-4382-8920-3A5DC3DCB9EB
  • F966065A-9BB9-4CB7-AEF9-4BB5570FF8E9
  • 9DBD814B-94E8-4ECD-A22B-1C1FAF4B4B81
  • 524F1237-B7A3-4855-9876-9BCC0292C6B0
  • 00A002FE-B364-4609-8B0D-CD8E9C7A665B
  • 49064643-431C-442E-AF30-65FDACB11A0C
  • DE4C3A62-197C-4AAB-8197-6FFAC0F02ED2
  • AF50B7D2-B547-49D6-83FD-368F0C487246
  • 8BDA3BBF-EA9C-43FB-A687-8E454CA2B741
  • 346CE767-B78B-440F-973D-A57A21C2FD0D
  • 85CB8924-71B3-449A-B2A6-4B2011126BED
  • B4CC81E9-7C61-451B-85F8-389C781E09E8
  • 092A1F9D-A6D6-4DED-8491-C8EFED6DE833

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×