Skip to main content

Hello All,

New member here.  I’m not new to model railroading, but I am new to Lionel and O gauge. I’ve searched and searched but cannot find info regarding phasing a ZW and a CW-40 transformer. When I connect my meter between the 2 no matter what combination of terminals I touch with the meter probes I get nothing.  I’ve read many forum post on phasing and seen the Lionel video, so I think I’m testing it correctly. Is it not possible to phase these 2 transformers?  I have a TMCC engine and do not want to damage it  

thanks for any help on this. 

John

Original Post

Replies sorted oldest to newest

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×