Skip to main content

Replies sorted oldest to newest

On the SC-2, slide the run/program switch to program. If you want 6 accessories instead of switches, press ACC 1 on your cab-1 or cab-2 and set. Slide to run and you have 6 accessories then. Do the same for reverting back to switches and you will get 6 switches. If you have a 2nd SC-2, you program that one with ACC 7 and you get ACC 7 to 12 then automatically programmed for that. Same goes for switches.

As for clearing, go to Lionel's website and use the search with the SC-2 product code for the manual for other questions.

Never used a SC-1 but it should program the same way as a SC-2.

I must be missing something here.  If you assign the ID/base address for the first switch to be controlled by the SC-2, the other switches are sequential.  Rewriting the base assignment also reassigns the other switches.  There isn't any need to clear an old base address before setting a new one.

Routes must be individually cleared, as indicated earlier.

 

(Page 13 mentions that ID#0 is reserved for clearing the settings.  I haven't tried that myself.)

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×