Skip to main content

Things in the train room tend to slow down for me from October through November as I spend time deer hunting.  This year that time was extended a bit due to the unexpected passing of my father and also my wife's grandfather who died 3 days apart.  The past 2 weeks have been a difficult time for us.

 

I'm back at it though.  Hope to have all this roadbed down by end of day tomorrow.

 

 

 

Last edited by MichRR714

 Charlie very sorry for your loss, I also have spent the last4 days working on the layout every little bit counts.

Originally Posted by MichRR714:

Things in the train room tend to slow down for me from October through November as I spend time deer hunting.  This year that time was extended a bit due to the unexpected passing of my father and also my wife's grandfather who died 3 days apart.  The past 2 weeks have been a difficult time for us.

 

I'm back it though.  Hope to have all this roadbed down by end of day tomorrow.

 

 

 

 

Just finished reading and viewing this thread from page 1 to here, Charlie, and top marks all around--prep, paint, bench framework, plywood deck, etc.!!!  Moving/handling that many 2x4's and ditto the 4x8 3/4" plywood wore me out just thinking about it--who needs a weight room--just build a layout.

 

Looking forward to future updates, and thank you for taking the time to share with us your progress thusfar.  And condolences to you and yours on your losses.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×