Skip to main content

Replies sorted oldest to newest

Yes, both locomotives had sanding facilities, but not "domes". The storage container wrapped around the boiler, were "flattish", hidden under the boiler jacket, and were accesed for sand loading from the top of the boiler.   In the drawing, the sand container was above the second set of drivers after the cylinders. 

http://paintshop.railfan.net/i...belanger/cp_t-1c.gif

Last edited by mark s

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×