Skip to main content

While reading through the latest NMRA magazine I noticed the Gapmaster ties.  I had been using individual PCB ties (such as those from Fast Tracks) over gaps in modules for years I was unaware of another option.  Seems whether you're hand laying track, or using flex track there might be options available if you're needing reliable methods to maintain gauge over gaps, such as those between two modules.

American Tie & Timber Company

Fast Tracks - Copperhead Ties

Attachments

Images (2)
  • blobid0
  • blobid1
Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×