It's been my experience with Atlas O Master Line and Trainman engines that you need to pay no attention to their shipping schedule. It took 8 years for the RSD 7/15's to get here. I think it was 5 or 6 with the U23b's. Since their Premier Line is made in the MTH factory they seem to be able to crank them out in a reasonable time frame. I fully expect it will be years before we see the F7's. I hope I'm wrong.

Ken

@base11 posted:

Any idea or communication as to when the Atlas F7s will arrive?  It was the last batch that C & O is part of.  They were scheduled to arrive by June and that was a later date than what was originally posted.

The most recent schedule we got from the factory has production in December 2023.  The online shipping schedule should be updated shortly, if it hasn't already.

There are still some supply issues with electronics, so hopefully these don't get affected.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×