Skip to main content

Bill:

 

Forgot to mention, no D56 lights as I really don't like them. However there will be a substantial number of lights. There will be 120 ft. of arched causeway with lights outlining the arches (similar to the PE movie). In two areas of the new layout, we are using Lionel die cast red street lights to light the Center of the North Pole and the large skating area. In the North Pole elf village, we are using MTH die cast street lights. There will be other special lighting effects as well.

 

I learned a long time ago that lights really make a layout, so watch for a lot of it on this one. 

After two coats of flat white paint, Installing the track and roadbed was next. Photo below shows the newly installed track. As in our other layout, we are using Lionel tubular track.

 

Next step, wire the track and get the trains running.

 

 

track done 001

Attachments

Images (1)
  • track done 001
Last edited by Former Member

I would have loved to use Johnson roadbed, but alas I could not find enough. So I went with Woodland Scenics. It has very good sound deadening qualities and looks pretty good.

 

Department 56 buildings, Christmas in the City on the primary layout, about 230. Dickens Village, about 100. And North Pole, about 60. Over the years I gave many away as I no longer had room for them. I kept what I really liked.

 

We will use the 60 North Pole buildings on the new Christmas layout as well as some custom structures.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×