Skip to main content

Can the reissue 497 Coal Loader run on Fastrack without massive, irreversible modifications to the wiring/controls?

 

Just bought one brand NIB for a good price, but when I unpacked it, I noticed the control track section was 3-rail, not Fastrack.  I packed it back up and put everything on hold.

 

I wouldn't mind adding it for the kids to play with but don't want to do anything irreversible wiring-wise that would destroy its value or resaleability later. 

 

Original Post

Replies sorted oldest to newest

Originally Posted by JC642:

Don't forget the #497 is a notorious rooftop detail destroying O-27 accessory that has yet to be upgraded to support today's higher RS and taller scale engines. 

Fastrack will only decrease clearance.

Joe

 

So build a platform. No big deal. Use styrofoam, wood products, roadbed, most anything will do. Take you an hour, max. 

 

Mine is at the end of a siding where nothing but an operating hopper or dump car is ever going to go under it anyway. If you have to put it on a main line, see above. 

Good to know about the rooftop detail.  I would have to check clearances properly before running anything if I installed this one.  Maybe a siding or else a platform is the best way to go with it.  Still haven't decided if I will keep it or sell it based on the clearance issues and the space problems.

 

I originally looked at it and it seemed like I could just run the Fastrack under it and, with a small overall footprint, it would be a fun accessory for my small 4x8 table. 

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×