Skip to main content

I've been able to get a little more done on the project.

Trim has been attached to all the edges of the roofs and they have been painted white.

The dormer was built up and has the siding, roofing and windows added.

Roofing has also been added to the front addition and porch area.

 

 

 

The porch support post are in place and the footings have been painted around the house.

 

 

 

The steps are completed on both front and rear porch.

 

 

Here is a view of the rear porch.

 

 

 

 

Link to previous post.

 

https://ogrforum.ogaugerr.com/displayForumTopic/content/2415514336641517

 

 

 

 

 

Last edited by jdcrawler
Original Post
Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×