Skip to main content

Here is another great method for connecting power to Atlas track developed by forum member Ingeniero No1. This post has all the info needed. Really easy to do and works very well. There are more detailed pictures here. There is also a link to Ingeniero No1's build thread at the bottom of the last linked post. He has some good info and tips on working with Atlas track and he also has a really nice layout. It's well worth a read if you have time.

UP SD70 posted:

 Thanks Dave. Sorry, I forgot to mention I don't have a PC. I use a Mac. 

Sorry, late to this, but wanted to share this bit of info with you as I run SCARM on my Mac.  I use PlayOnMac, which is also free, to run SCARM.  You don't get the 3D view, but it will get you going so you can take what moonman and the others have shared with you and try some of your own planning.

Here's the fitment on your tables to allow for layout completion, displaying the outlines for the decking, except for the diagonals. 3- 4 x 8 and 1-4 x 5.

I still think that if you float it off of the wall, at least 3' for an aisle, you'll be happier in the long run.

You may have also wanted to make the tables separate and bolted together with carriage bolts for the unknown future need to move it or reconfigure it.

Bore some holes for wire pulling in the cross members before you put the decking on it.

Attachments

Moonman posted:

Here's the fitment on your tables to allow for layout completion, displaying the outlines for the decking, except for the diagonals. 3- 4 x 8 and 1-4 x 5.

I still think that if you float it off of the wall, at least 3' for an aisle, you'll be happier in the long run.

You may have also wanted to make the tables separate and bolted together with carriage bolts for the unknown future need to move it or reconfigure it.

Bore some holes for wire pulling in the cross members before you put the decking on it.

Thanks!! yeah.. I have the measurements already.  

The only side that is against the wall is the very far end in the picture.  The other side is about 2' from the wall.. It may look like it's flush with the wall but it's not.  None of the tables are connected yet.  I plan to bolt them together.  I already am thinking of moving it to a different part of the basement.  It's kind of crammed in there.   Not sure though.

Quick update.  

Got most of the table put together.  Still need to do a little more.  Just painted it.. I'm not loving the color, but by the time i lay the track, ballast it, put up structures, and grass, etc... it should blend in.  IMG_0944

By the way.. I got all my Atlas track at http://discount-train.com.  They have the best prices (from the comparing I did), and were very very quick on the shipping.  They ship FedEx with tracking.  I'd recommend them for sure.  The shipping wasn't bad, but I didn't have to pay tax, which would have been much more.  

Attachments

Images (1)
  • IMG_0944
UP SD70 posted:

Quick update.  

Got most of the table put together.  Still need to do a little more.  Just painted it.. I'm not loving the color, but by the time i lay the track, ballast it, put up structures, and grass, etc... it should blend in.  IMG_0944

By the way.. I got all my Atlas track at http://discount-train.com.  They have the best prices (from the comparing I did), and were very very quick on the shipping.  They ship FedEx with tracking.  I'd recommend them for sure.  The shipping wasn't bad, but I didn't have to pay tax, which would have been much more.  

paint some random area with Behr "Buff" or Benjamin More Cocoa Sand

here's a layout where the base color was applied somewhat randomly because that's what they had - three colors

Bloomfield Ohio

 

Attachments

Images (1)
  • Bloomfield Ohio
Moonman posted:

Good to hear from you. I hope all is well.

Now you can run a train. That always makes the building process more fun!

NO QUESTION.. I think it sat there for so long because I knew the work involved to glue the trackbed down, and get the track screwed in.  I learned the hard way by gluing the trackbed down as I put the track together.  When I was about 2/3 done, the tracks weren't meeting together.  I didn't realize how much give there is on Atlas O track. A stream of 5-6 straight or curved tracks can bend quite a ways.  I was used to Fastrack where there is no give at all.    I had to scrap up a bunch of glued down track bed.  and redo both the semi-circles on each end.  Now that it's running.. I'm a lot more into it as far as wanting to get the rest put together.. get some more locomotives and cars.  I think I may pull the trigger on a DCS Remote with TIU.  I only have 2 locos right now, so debating on getting a new loco or the DCS/TIU setup.  Can't do both ( Man Atlas Trac really adds up.  Especially those stinking O-72 Track Switches.. I think there's a total of 19-20 switches on this layout (if I complete it).   

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×