Skip to main content

Beings I'll be moving around the first week of December it was time to start the tear Down. All the buildings have been bubble wrapped and packed away. All my steam engines are in the process of being packed away in their box's. It's always sad to tear down a layout but I hope for a better layout that will not be much larger but will be in a nicer area. 

 

Now back to the packing.

Original Post

Replies sorted oldest to newest

Originally Posted by Traindiesel:

Dave!  You've built and torn down two layouts now before I finished one! 

 

You're not moving too far I hope.

No not really Brian, same area just easier for my brother Ron and myself. I'm moving to a condo on the fourth floor of a really nice building. With Ron's arthritis the elevator in the building will make it much easier. 

 

Although my layout will not be the dream layout I always wanted it will be more then enough for me, plus it will be in a A/C and heated area. 

 

 

 

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×