Skip to main content

Contrary to all the rumors, I haven't lost my mind. 

Well, maybe just a little.  I am gathering information for building a steel-mill related machine that runs on very wide track.  Think something like a gantry crane in terms of track width.  I am probably going to have to hand-lay track on very wide ties.

Any recommendations for track type, size, ties?  I'm a real novice in this area.

Thanks,

George

 

Original Post

Replies sorted oldest to newest

Have you considered slicing  the center out of a strip of flex track.  Crane rails can be 20 +/- feet apart.  Maybe think of using "concrete" tie track.

I am thinking that you mean "long" ties.  Like 20 feet or so.   Not wide ties like 18" or so, right?

If this is a less serious effort you may want to give GarGraves a call.  They have an over width 5 rail track which is made with  3 rail track in the center with a pair of wide rails for a rolling gantry crane.  Bury it in gravel to hide the oversized ties and rail.

GG will make any of their track in 2 rail.  Even 2 rail crane track.

All one piece with long ties.

Image result for gargraves 5 rail crane tack

Last edited by Tom Tee
Tom Tee posted:

Have you considered slicing  the center out of a strip of flex track.  Crane rails can be 20 +/- feet apart.  Maybe think of using "concrete" tie track.

I am thinking that you mean "long" ties.  Like 20 feet or so.   Not wide ties like 18" or so, right?

If this is a less serious effort you may want to give GarGraves a call.  They have an over width 5 rail track which is made with  3 rail track in the center with a pair of wide rails for a rolling gantry crane.  Bury it in gravel to hide the oversized ties and rail.

GG will make any of their track in 2 rail.  Even 2 rail crane track.

All one piece with long ties.

Image result for gargraves 5 rail crane tack

Tom,

That is a really good idea - very much worth considering.  Thank you!     It would save a great deal of time. 

Instead of burying the ties in gravel, I would put a sheet of styrene over them to simulate a metal industrial floor.  I'll check the width of that track to see how well it fits inside the mill building.

George

George,  GarGraves will make one of those crane multi rail track beds in 2 rail for about the same money.   Or maybe find a three rail version and remove the center rail.  Never did that. just supposin'.

May be easier to straight edge trowel plaster over the installed track  with small strips of plastic next to the insides of the rails.  If you are going to use troweled plaster you may get away with  just troweling the plaster tight in against the middle rail and texture paint the entire plastered surface.  Apply a little oil on the inside of the outside rails and the thin strips of Plastic flange plugs to inhibit plaster from sticking for a easy clean up.  We have used grease or petroleum jelly instead of oil if that is handy for you.

Been cutting tie stock all week. Around 500 board feet. Should be enough for 300 to 350 bags of ties. Hopefully enough to last a while. Burned up the motor on my old Craftsman 12". One more clean-up cut and I'll be ready to rip some actual ties. Three tie strips per slat (what in the photo.  Should be around 265,000 ties.  That ought to last a while.

I'm whipped for today. No more self installed splints this time.

Lou was right, sure makes a lot of sawdust.....and me
with no orchard to dump it in.

Jay

Attachments

Images (4)
  • 2017-10-31 001
  • 2017-10-31 002
  • 2017-10-31 003
  • 2017-10-31 004

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×