Skip to main content

Our new client, a man past retirement age, had a small layout of his own on which he'd assembled accessories, mainly Lionel, that he and his father had collected over the years. Now he wanted to pass these train treasures on to his son and particularly to his grandsons. Clarke and Fletcher went to his home and disassembled his layout taking an inventory of the trains, track, buildings and, primarily, the accessories many of which were antiques. They brought the collection back to the studio where our staff checked everything out and repaired the few pieces that needed repair.

After conferring with the client's son, in whose home the new layout was to go, Clarke, with Fletcher at the computer, designed a layout which, while having a lower track area which the client's six year old grandson can handle, will also be sufficiently sophisticated that his father will enjoy it now and the youngster can grow into. And the Family Heritage Lionel Layout was on its way into being.

BarbRay and Bob at the bandsawRay assembling framing pieces for FHLLframing pieces for Family Heritage Lionel Layoutanimations for Family Heritage LayoutTom picking out an animation to check onTom checking out an animation for Family Heritage LayoutComputer drawing of Family Heritage Layoutdrawings for Family Heritage Layout base

Attachments

Images (8)
  • Computer drawing of Family Heritage Layout
  • drawings for Family Heritage Layout base
  • Ray and Bob at the bandsaw
  • Ray assembling framing pieces
  • framing pieces for Family Heritage Lionel Layout
  • animations for Family Heritage Layout
  • Tom picking out an animation to check on
  • Tom checking out an animation for Family Heritage Layout
Last edited by Dunham Studios
Original Post

Replies sorted oldest to newest

It's amazingly only ten by twelve in size.  And a real gem.  The client had already worked-out such a good trackplan that we blissfully copied it (see below), while adapting it to the MTH RealTrax System.Computer drawing of Family Heritage Layout This is our new design.   Original Layout Overview--For Web This is an "Original View"  The lower level that we added is set up as a "Six-year-old level" for the client's youngest grandchild.  It will have its own LionChief train and controller, as will all the four other LionChief trains on the upper level.  As there are also Period Classic "Lionels" in the mix, handed down now through four generations, every level will also have its own "Traditional Control" as well.  Even with traditional control you can run several trains on the upper loops if you throw your turnouts properly.  Wouldn't want to crash that 1930s Lionel Streamliner (see below).  About running four trains in "traditional-style", your guess is as good as mine, but we'll be careful on that "first run"---just in case.1930s Streamliner Detail--For Web

Attachments

Images (2)
  • 1930s Streamliner Detail--For Web
  • Original Layout Overview--For Web

In reply to Mr. Landsteiner's request, answer #1 is that I don't feel that sectional track makes a nice appearance and further, all those track joints make for unreliable operation over time.  Answer #2: It was also the gist of the donor's wishes that the re-creation of his layout be made with the most modern of materials.  Granted that, in my long gone youth, putting sectional track together and keeping it together in spite of my very large and rambunctious Springer Spaniel named "Rippy" may have had something to do with it as well.  As to the matter of Brand Name, I just liked the look of RealTrax better; darker in color, more like the tone of the stone ballast that I prefer.  Nothing against FasTrack.  I'm sure it would provide reliable operation just as well.  In this day and age of "Brand Cross-pollination", the choice seems perfectly OK to me.  So, we have Lionel trains and Accessories blended with MTH Track and Accessories, blended again with new Williams Locomotives and cars as an addition to the heritage Lionel product.  During my many years at The Station at Citigroup Center I learned that if you wanted something that really ran--all the time, no questions asked--I'd buy Williams over all other Brands, hands down.  We ran virtually no Lionel at all, largely due to the fact that I was an American Flyer guy in the first place. Springer Spaniels and other childhood prejudices probably helped lead to some of these decisions as well.  But the Williams choice was made in the light of clear, plain, "Operating Facts".  As Mr. Landsteiner notes, I am very busy, in this case juggling the work here with a new New York City Opera production of Leonard Bernstein's"Candide", opening in January----but never too busy to answer questions on the OGR Forum.

 

Supports are added before the platform tops are put on. Remember that the sectional wooden trestle parts have already been made as well as tunnel portals cast and base painted and a number of bridges have been cast and/or assembled and are waiting in the wings, so to speak, ready to go on when the time comes. Just as an aside, the layout that you see under construction behind the Family Heritage Layout is the Quechee Gorge Layout which has its own thread on the Forum and on which we've been working for several months.

BarbFamily Heritage Layout with internal supports set upFamily Heritage Layout low end view 11-30-16

Attachments

Images (2)
  • Family Heritage Layout with internal supports set up
  • Family Heritage Layout low end view 11-30-16

Ray has finished the upper level left platform on the layout. And he and Bob carry it out into the barn to place on the waiting frame. You'll notice that there is a one-step-up narrow platform to the left and right of the center front section. This will carry the track for the area specifically designed for the client's younger grandson, a level that he can deal with with no problem.

Looking at the larger platform you'll notice an odd cut in the right corner. This jog is built to go around an irregularity in the train room wall. In the construction photo you'll see that Ray has built another odd shape on. This is one half of a pop-up hole  built so that the person running the trains can get to any train disabled too far in from the perimeter to reach comfortably from the perimeter.The bundles of track in the last photo are checked out, wired and ready to go when the platforms are finished.

Barbfront and left side of FHL layout 12-2-16front and right side of FHL 12-2-16Ray framing pop-up hole on large right platform topRay stapling into platform sideRay working on FHL right rear platformFHL left platform partsBob & Ray carrying platform from carpentry shoplarge platform top in placelarge platform top seen from center of layoutbundles of ready-to-use track for FHL layout

Attachments

Images (10)
  • front and left side of layout 12-2-16
  • front and right side of layout 12-2-16
  • Ray framing pop-up hole on large right platform top
  • Ray stapling into platform side
  • Ray working on right rear platform
  • Unassembled left platform parts
  • Bob & Ray carrying platform from carpentry shop
  • large platform top in place
  • large platform top seen from center of layout
  • bundles of ready-to-use track for layout

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×