Skip to main content

My sister-in-law sent me the link to this time lapse video of the installation of a new bridge (Walsh Torrence Bridge) for use by the the Chicago South Shore and South Bend RR.  The bridge is 398' long and weighs 4.7 million pounds.

 

The coolest thing about the bridge is that she designed it.  It took many years from the time she designed it to the time it was built and installed.  The video is made from snapshots at 10 second intervals.

 

http://www.youtube.com/watch?v=yx0-MXI-U5Q&feature=em-share_video_user

 

Enjoy!

 

Last edited by C&O Allan
Original Post

Replies sorted oldest to newest

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×