Skip to main content

I added the sidewalks and cement cap/end pieces for the underpass, along with some ground cover. I installed more retaining wall pieces and some ground cover behind the girder bridge, and installed a cement retaining wall in front of the higher level industrial area on the layout known as “the hole”. I’ll add the street portion to connect that area with Jericho Turnpike (underpass) soon. I also put in a layer of some 1/2” Homasote in the corner and up the side of the grade. I’ll paint it earth brown and put down some ground cover and trees. I think it’ll be nice to give this area a little elevation. Thanks for looking.

Andy

ED26FFCD-1A84-46C5-87D9-FAF69D401DCFA0347C5D-C008-4282-B9DC-DD2E25762BFB0D248ACD-F69A-42B9-9376-ED791C6490855B9A682C-5C7B-4E33-8909-FF6E8BA9A8B7BA7EE57D-45CF-4C4F-BD4D-0329F1DDBD5B855C2D47-BC78-4D0D-995C-60347C81CC1ADFD487F0-4E68-4C0F-A8BA-138B1572A79CB710BD13-8294-4D41-881C-009CD4BAED0568BA604B-B417-4D12-9F26-C4D88BD782FE398116E7-580A-4D54-B675-84F6BAF7F63D

Attachments

Images (10)
  • ED26FFCD-1A84-46C5-87D9-FAF69D401DCF
  • A0347C5D-C008-4282-B9DC-DD2E25762BFB
  • 0D248ACD-F69A-42B9-9376-ED791C649085
  • 5B9A682C-5C7B-4E33-8909-FF6E8BA9A8B7
  • BA7EE57D-45CF-4C4F-BD4D-0329F1DDBD5B
  • 855C2D47-BC78-4D0D-995C-60347C81CC1A
  • DFD487F0-4E68-4C0F-A8BA-138B1572A79C
  • B710BD13-8294-4D41-881C-009CD4BAED05
  • 68BA604B-B417-4D12-9F26-C4D88BD782FE
  • 398116E7-580A-4D54-B675-84F6BAF7F63D
Last edited by Steamfan77

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×