Skip to main content

So, Walt how many days, weeks, etc did it take you to put all this together.  It is an incredible layout, with lots of activity'....👍😁

well, 'put all this together' has components to it.  I spend from Feb. to around late summer planning a track design and accompanying scenes that I want to use, and where.  Of course, that time is off-and-on.

Building the layout itself takes me usually around 7 weeks.  Same for taking it down, cleaning everything, and putting it all in storage.  A labor of love though!!!!

thanks for asking

walt

#35 in my count"UP" series of Christmas layouts.

The inverted 'L' is the upper level position.

- walt

Layout_1_Track Plan_F

planning the scenery

Layout_1_scenery_F

Something a little different just to show more of the planning that goes into it.  Planning lockons and 'blocks' (I use DCS and it's preferred)

35 2011 Layout_1_lockons_F

Left Side with all trains_1 - USEDWeek 9_2Week 9_1Week 9_3

some night images

Drive In Overall from Vending Area - Twilight - USEDOverall from Door - TwilightOverall From Hall - Twilight - USEDDrive In Stage and Marquee closeup - Night - USED

and 2 of my favorite type of picture

Overall from front door - Trains running - USEDOverall from hall - Trains running - USED

The hazard of having a 2nd level on a floor layout.  In the top of ths picture is a black and white engine sitting on a switch - that switch went bad and I had to find a way to replace it.  Talk about needing all of the patience in the world!!!!!  But it had to be replaced because it was a critical one to have.

Week 8_Switch_goes_Bad_1

Attachments

Images (14)
  • Layout_1_Track Plan_F
  • Layout_1_scenery_F
  • 35 2011 Layout_1_lockons_F
  • Left Side with all trains_1 - USED
  • Week 9_2
  • Week 9_1
  • Week 9_3
  • Drive In Overall from Vending Area - Twilight - USED
  • Overall from Door - Twilight
  • Overall From Hall - Twilight - USED
  • Drive In Stage and Marquee closeup - Night - USED
  • Overall from front door - Trains running - USED
  • Overall from hall - Trains running - USED
  • Week 8_Switch_goes_Bad_1
@walt rapp posted:

well, 'put all this together' has components to it.  I spend from Feb. to around late summer planning a track design and accompanying scenes that I want to use, and where.  Of course, that time is off-and-on.

Building the layout itself takes me usually around 7 weeks.  Same for taking it down, cleaning everything, and putting it all in storage.  A labor of love though!!!!

thanks for asking

walt

Not a total comparison , but I know what a Dodge Charger Hellcat is capable of doing in a quarter mile but I never saw anything as fast and capable as the work ( play ) that you have accomplished Walt. .

..........and the results are terrific sir.  Nice.      God speed  and thank you for sharing.

Not a total comparison , but I know what a Dodge Charger Hellcat is capable of doing in a quarter mile but I never saw anything as fast and capable as the work ( play ) that you have accomplished Walt. .

..........and the results are terrific sir.  Nice.      God speed  and thank you for sharing.

Indeed, Walt is one of the most dedicated O Gauger's on this forum'  True patience of a saint'.. God speed and continued good luck and health'..👍😁

Count"UP" #39 for my Christmas Layouts

- walt

track plan

lower level

Drawing - lower area

upper level

Drawing - upper area

z - Overall from Hall from Davez - Overall Floor Level from Hallz - Overall Floor Level right side_2z - Overall Floor Level right side_1z - Overall Floor Level from middle38 2014 z - Overall Floor Level fromz - Overall Floor Level from

Some at night

z - Night From Front Door Low Angle_3z - Night From Kitchen Straight onz - Night From Hall

For the first time, I set up all 6 models of family members' houses that I built.  It was enjoyable to see the out and grouped to make a scene

z - Week 6_3z - Week 6_1

this is the front area which isn't seen in any of the above.  At that time I was hosting what we called the 'Train Party' for all 28 local family members.  Lots of kids 10 and under so each year I would create a 'candy train'

z - Candy Train and Crane_1_F

Attachments

Images (15)
  • Drawing - lower area
  • Drawing - upper area
  • z - Overall from Hall from Dave
  • z - Overall Floor Level from Hall
  • z - Overall Floor Level right side_2
  • z - Overall Floor Level right side_1
  • z - Overall Floor Level from middle
  • 38 2014 z - Overall Floor Level from
  • z - Overall Floor Level from
  • z - Night From Front Door Low Angle_3
  • z - Night From Kitchen Straight on
  • z - Night From Hall
  • z - Week 6_3
  • z - Week 6_1
  • z - Candy Train and Crane_1_F

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×