Skip to main content

We have an 8x10 MTH DCS layout without any elevation changes. We're in the process of adding a TIU, WIU, AIU, terminal blocks, six switches, accessories, etc., and I'm wondering how best to manage the wires. I've thought about laying 5-6 inch blocks of 3/4" thick wood under the track joints to screw the track pieces together and effectively create small gaps between the track and rug so I can run the wires easier. Not sure if this will cause some track/train stability issues or something else I haven't thought of. Any thoughts on this or other suggestions to best manage all of the wiring?

Original Post

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×