Adrian Tang acquired a Shuco Disney-Alweg monorail and a large quantity of track. Being very creative, he engineered (pun intended) a control system that includes station stops, speed up/slow down operation at the station stops (stations to be built later), and self-parking when not in use. Here's the video:
Here's the staging track. Adrian is looking at having it rotate between two trains. The red one is EXTREMELY rare and is from Adrian's personal collection.