Hi Everyone, its been a rough ride the last couple of days! But it will pass. I haven't posted much here lately cause I have been building my wife a She Shed! LOL
But the last couple of days I have been working on the train room. I got all the legs mounted to the walls, I have the "L" girders built and in place for the 2 long walls, with the 2 short walls to do. Then it will be time to cut a lot of 1 x 4 x 30" pieces and drill holes for the wiring. Then I can start putting them on the girders. Wasn't the nicest day to day, after my first 2 rips for the tops of my girders, the switch on my table saw went out and it took me an hour to track the problem and replace the switch. Got the last rip cut done and everything mounted. Lowered the bridge for the picture below and the darn switch went out on it, It would not go up!, Went and found another switch after I had to crawl out, got it replaced and all is good now. I hope you enjoy the update!