So I finally got a few switches and made a a carpet layout...It has 2 switches and enough space to do a little switching layout....about 10 feet long. Takes my Atlas Southern engine 3:26 to go from the left side end to the opposite end at speed step 1. I thought that was pretty good. I need to setup motor control for my CSX Dash 8 too. I have just enough room to do a little bit of switching. Helps pass the time. Anyway here are some pics...will try to get a short video this weekend. I have a few more engines on the way, so I can swap them out when I get tired of seeing these. Oh yeah, the "layout" is in front of my fireplace...under the TV on the wall, so I can watch TV and/or run trains...best of all worlds right now!
Original Post
Replies sorted oldest to newest