Skip to main content

I thought I would show what happens when the Lehigh Valley High Railers set up for a show.

 

Here is my train room, complete with layout. 

Show 001

 

Step one: Dissassemble, pack, and remove everything!

Show 002

 

Step two: Load it in a truck and haul it to the show site.

Show 002a

 

Step three: Unload the truck.

Show 003

 

Show 004

 

Step four: Set up the layout

Show 005

 

Show 006

 

Show 007

Almost there!

Show 008

 

Step five: Have fun operating!

Show 009

 

Show 010

 

Steps six, seven, eight: Dissassemble, repack, reload the truck and haul it all back.

 

What the room looks like for now.

Show 011

Chris

LVHR

Attachments

Images (12)
  • Show 001
  • Show 002
  • Show 002a
  • Show 003
  • Show 004
  • Show 005
  • Show 006
  • Show 007
  • Show 008
  • Show 009
  • Show 010
  • Show 011
Original Post

Replies sorted oldest to newest

The train room is an upper story room, not the basement. You can tell from the stairwell in the first and second pictures. Actually, the wall with the heater has two blanked off windows. Looks normal from the outside.

 

The individual club members own the modules they make. I actually have more modules than I can put up at once in the room. Some get stored underneath the layout, and others get stored in a warehouse.

 

It takes us about 5 hours on average to set up, once we arrive at the site, including unloading the truck. It takes about 2 hours to break everything down and reload the truck. Of course, having a bunch of hands available helps!

 

Half the battle when doing modular displays is figuring out how best to transport things, have them arrive intact, yet still be able to set up quickly. And the modules are not getting any lighter as we get older!

 

Chris

LVHR

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×