Roofing contractor installed downspouts.  Supposedly, the contractor will extend the discharge farther away from the building.

2017-11-11 0012017-11-11 002

The Track Laying Crew put their best end...er...effort in laying track on the upper level.

2017-11-11 003

Look I removed a screw.  The Wrecking Crew led by Ted had to modify the height of the bridge abutments.  Somehow, gremlins made them about and eighth of an inch too high (seems that dimension crops up a lot).  Had to do some demolition in removing the abutments and shortening them.  After that, all was well (except for the requisite commentary by the Wrecking Crew).

2017-11-11 004

2017-11-11 007

Ted makes the completes the  connection of track 3 to the bridge.  The other half of the crew, Tom, had to leave saying something about leaves calling him (don't know what that meant, guess something was blowing in the wind).

2017-11-11 006

Meanwhile, the rest of the trestle was being installed.  Had to repair some minor damage.

2017-11-11 005

After cleaning the track, test ran the Conrail SD-45.

2017-11-11 0102017-11-11 011

Views along the trestle.  The last section of the trestle was not installed.  It'll have to be modified to fit when the elevated section on the north side is installed.

2017-11-11 0082017-11-11 0092017-11-11 0122017-11-11 0132017-11-11 0142017-11-11 015

The second scenery panel is finished and will be installed soon.

 

 

Attachments

Photos (15)

Mark,

We use the rubber padding for the knees even though I really don't need them. They are there for the "older" crowd who has to inspect the "younger" crowd's work!

Yes, had to pull off the bridge abutment to cut an 1/8" off of them so the bridges align equally to the gargraves track heights. With doing that, I was given 4 new screws for each abutment. The senior track layout manager approved me to use 8 screws. As for the track laying, the 2 apprentices used a few more than he would have used so his inventory of screws is lessening now. Think he has about 6,895 screws to use now.

The wooden trestle were installed and look really good. These came from the previous layout. They cleaned up and re-sprayed with black paint. Will finish up the inside elevated line to the bridge this week and commence work laying tracks through the entire trestle.

The senior track layout engineer/manager will start cutting wood for the other side of the layout to start the elevation there.

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

Ted,

It seems you are working with a tough crowd there!!    I heard of rivet counters, but not track screw counters!    All in good fun, I know!  The group is doing an excellent job!  since we don't like the beach, you are giving us an excuse to visit the Jersey Shore someday!!

Rivets, screws what's the difference?  We count 'em.

Mark (and for any other forum member), you're welcome to stop by anytime.

You are welcome to stop by anytime and you even get a chance to inspect the "screwed more than many" layout. Bud is over using his weekly allotment. LOL!

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

Only 1 track screw left? Thought the minimum to be left with stands at 100 so we can sell a 100 pack for $10 to recoup part of our investment on the 10,000 we initially bought.

Bud is using way too many screws. It shows in the layout as it will never come apart unless a bulldozer hits it!

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

No work stoppage here as we will be there Saturday am installing the 4 line to the line but working back from the bridge and drop a small straight after the curves are installed.

Wonder who reminded me to do this? Think his name could be the senior nutty track professor/layout engineer. 

Yes, the 2 track apprentices "screwed up" last week laying track directly to the bridge. Ohhh.. are you going to cut that curve down to fit it in? Oh no you are not. Cut it in on a straight. Oh... I forgot. The SNTP/LE does a few things correctly! Lol!

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

Line number 4 of the elevated lines was completed to the first bridge on Thursday. Next up is to solder all the rails on both elevated lines up the ramp to the bridge and lay straights all along the wooden trestle that Bud put into place.

We are making progress once again.

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

Pic of track 4 to bridge.

2017-11-17 001

Tried DCS to see if the Passive TIU connection for tracks 1 and 2 works.  Initially had some problems.  Tried running my Red Arrow Electro Liner.  Even after charging, it didn't respond to either DCS or conventional.  Then tried a PRR ten wheeler that Dennis had with no response.  Since neither of these engines responded in even conventional, the batteries may not have been charged enough or need replacement.  Eventually tried Dennis' EDM diesel, and had success.  Track 1 and 2 worked well.  However, did not take any signal readings.  Used the cross-over to run on track 3 and had no problems.  Was a little concerned that the TIUs were not in Super TIU mode.  No problem.  Except, when the engine got up to the bridge and was stopped for a pic, it stalled.  Had to get out the ancient creaky crawler with the five-fingered crane to retrieve the engine.  Tried track 4 and had no problem.  From a DCS standpoint, looks like we're good to go on all tracks.  So we're able to run any type of train on our layout.

2017-11-17 002

 

Attachments

Photos (2)

So it must be the track laying "apprentice turned to expert" crew work that there were no problems operating on tracks 3 and 4! Guess they know how to lay down the track and screw it into the ceiling tiles properly with the correct amount of allotted screws.

Started to solder some rails on 3 and 4 and fix a few solder joints that were not soldered right to my standards, they are neatly done! Stopped soldering and cleaned all the new track joints with the Dremel to be soldered next week.

We are making progress. Have to get the senior layout engineer his wood so he can start cutting it to make the ramp on the other side of the trestle.

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

Not much activity construction wise.  Mostly due to Thanksgiving.  Still need to get additional plywood.

Got the Legacy Cab-2 software upgraded to ver. 1.61 ( the base w/ver, 1.60 didn't need upgrading).  A big thanks to Steve, part of the Command demo team at the Greenberg show in Edison this past weekend for doing the upgrade (guess who's also part of the team - hint name starts with "T").

Johnbrandt finished the second scenery panel and was installed by the crew.

2017-11-28 001

Some scenery panels were given to us by a fellow O-gauger who was dismantling his layout.

2017-11-28 0082017-11-28 0092017-11-28 0102017-11-28 016

Did some train runnin' tonite.

Ed's WBB 44 tonner.

2017-11-28 003

Ted brought his newly acquired MTH UP Big-Boy.

2017-11-28 0062017-11-28 007

Fortunately or unfortunately, we had a chance to check clearances on the curves.  Knew the Big-Boy has a pretty big overhang and it was confirmed.  Here it is on an 096 curve.

2017-11-28 004

The Big-Boy approaching a 40 ft. box car.  Closest clearance is about a quarter inch.

2017-11-28 005

Won't be able to run longer cars on track 1 with the Big-Boy on track 2.  Didn't try clearance into the trestle.  Looks like we'll have the capability of running only about 99 percent of engines.  Otherwise we will have to have restricted running.  We did experience a clearance issue on the curve in the northwest corner with my Polar RR train.  Track 2 curve is closer to track 1 than it should be.  Track 2 is slated to be relocated in that area.  The Big-Boy clipped the door of the Polar RR's first box car midway thru the curve.

2017-11-28 014

A few shots of my Lionel Polar RR train.

2017-11-28 0112017-11-28 0122017-11-28 015

 

Attachments

Photos (14)

Thank you for all the photographs, Bud!  Well it is good to check all clearances now!  Ted's Big Boy looks great!  The Polar train looks good moving along!  John did another fine job.  The backdrops that were given to you look great too, but of a more rugged terrain!

Won't be able to run longer cars on track 1 with the Big-Boy on track 2.  Didn't try clearance into the trestle.  Looks like we'll have the capability of running only about 99 percent of engines.  Otherwise we will have to have restricted running.  

What? Restricted running! Total blasphemy. Undo the layout, take out 3,236 screws from the track and re- lay the track. None of this 99% BS. The senior layout engineer/professor who claims to have built a few layouts to earn his credentials has not admitted a screw up and needs to unscrew the 3,236 track screws and do it all over again. It needs to be perfect like him. LOL!

Anyways, my big boy run real nice around the layout on track 2. We have to try track 1 and see the trestle clearances. Maybe Bud will have to re-locate the trestles? His wood for the other side of the elevated runs is coming this Wednesday so layout construction will commence this week. 

Soldering of all the track 3 and 4 lines up the ramp to the bridge plus his start on cutting wood for the other side's elevation.

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

Got a delivery of wood.  Marked 2 sheets of plywood for cutting of the straight and curved sections of the ramp.  A bit of a snow storm got in the way causing cutting to be delayed.

Today, OCSMR was at the Monmouth Museum in Colts Neck, NJ supporting the museum's train display that we had helped to set-up.  A bit of exposure for both the museum and OCSMR was an article that had appeared in the December 1st issue of USA Today listing train displays to see including the museum's and the mention of our club.

Here're a few pix of the display.

2017-12-10 0012017-12-10 0022017-12-10 0032017-12-10 0042017-12-10 0062017-12-10 0072017-12-10 0082017-12-10 0102017-12-10 0112017-12-10 0122017-12-10 0132017-12-10 014

Attachments

Photos (12)

We did experience a clearance issue on the curve in the northwest corner with my Polar RR train.  Track 2 curve is closer to track 1 than it should be.  Track 2 is slated to be relocated in that area.  The Big-Boy clipped the door of the Polar RR's first box car midway thru the curve.

Track 2 got its re-location done last week with 4.5 to 5 inch clearance between the curves there. Bring on the Big Boy and the Polar Express train! No more restricted running there! Just have to test out track 1 and the trestles. 

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

All the track sections on line 3 and 4 have soldered together up until the elevated Atlas bridge. Next is to cut 2 small track sections between the switches on the other side of the bridge along the elevated trestle.

Wood to be cut next week to begin elevated construction on the other end of the elevated 3 and 4 lines.

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

OCSMR was running train at Hobbytown in Toms River, NJ for their grand opening.

Here's Bill who is used to running trains with a "transformer" and had to learn to use  the Legacy Cab-2 to run his 70s General thru the TPC.  With some trepidation he did get his train to respond.  Don't know if we have a new convert to the beginning of command control.

IMG_20171216_110145

Dennis and Ted.  Dennis running his Christmas General.  The Polar RR is mine.  The snow globe car was a big attention getter.  Later Ted ran his C&O Allegheny with aquarium cars and eventually gave the Cab-2 to a young guest who had no trouble operating Ted's train (wish I would have gotten a pic ).

IMG_20171216_120705

Customer traffic was brisk through our stay 'til 4pm.  Wish Hobbytown success.

 

 

Attachments

Photos (2)

The young boy who was there had no trouble mastering a cab-2 with my 30 second tutorial lesson. Was running my scale mallet and was having a load of fun. Unlike that guy named Bill who got the 15 second tutorial and was saying" what is this thing"! Lol!

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

Johnbrandt brought a few festive buildings for the holidays.  Dennis' Rudolf train made a holiday appearance.

2017-12-22 001

Later, added some of our AmeriTown buildings that had been in boxes damaged by our "flood" couple of months ago.  Looks like a good place to add more of the same since space is at a premium for buildings.  Rudolf is still there.  Must be a stash of magic corn in those buildings.  Wonder if he'll fly away or is he got too much of a load.

2017-12-22 0022017-12-22 003

Cut most of the ramps for the north side of the layout.  Replaced my 45 year old saber saw, which did a good job but used an old style blade which is hard to come by (makes you feel good when tools you have are now obsolete).  The new one does a good job and almost cuts by itself.  This piece goes around the roundhouse.

2017-12-23 001

The ramp will go up toward the north end.

2017-12-23 0022017-12-23 003

From the north end, the ramp goes down.

2017-12-23 0052017-12-23 0062017-12-23 0072017-12-23 008

2017-12-23 004

Ted soldered the track to the twin bridges and connected the "Y" to the outer tracks on the trestle.  He's taken his track laying skill to Level III.  Holding off doing the north end until we locate the end of the trestle.

2017-12-23 010

The west wall is a scenic challenge, especially with the inset of the windows and the trim.  The scenery committee has some decisions to make.  The trestle just cries "urban" background, not the scenery of our acquired scenery panels.  Added a few of the crude cardboard building fronts I made long ago just to see how they look.

2017-12-23 009

The members of OCSMR wish everyone a very Merry Christmas.

 

 

 

 

Attachments

Photos (13)

Good progress Bud!  Thank you for the update and photographs!  Your saber saw was 45 years old.  Hmmm....Mine is almost as old, and I haven't used it in a few years.  I hope to be needing it this winter, but I remember it was a chore to cut roadbed with it.  Maybe I will upgrade too whether blades are available or not!  Thank you for the tip!!!

Mark, 

We used ceiling tiles painted upside as the roadbed over plywood instead of using homosote board. Ceiling tiles were easier to cut. 

As for my Level III track laying certification, it look a little fiddling to get both switches aligned with the Y switch using a Dremel cutting wheel to fit both pieces of slightly bent track between the switches. And with little to no help from the professor!

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 

L.I.TRAIN posted:

Ted

Good luck in your new location. Curious will the HO layout overlap with the "O" gauge layour or is there seperate space dedicated for HO?

Steve

The layouts are separate. The HO is a layout depicting the NY&LB from South Amboy to Bay Head with PRR/CNJ operations. O scale layout is freelance. Both are in separate rooms which helps honestly because the goal of each layout is different.

- Joe

Somerset County 4-H Trainmasters, METCA,

Independent Hi-Railers Eastern Division,

Ocean County Society of Model Railroaders,

Raritan River Chapter of the NRHS,

Black River Railroad Historical Trust

 http://raritanriver-rr.com/

http://www.blackriverrailroad.com/

 

 

"You're too young to remember the Raritan River!" -Told to me by a man at a train show.

The ice age has ended with the coming of a moderate temperature monsoon and slowing making a return to colder temps.

Two of the three free scenery panels were removed since they were in the way for installation of the NW elevated area.

Ted and Jim, our O-Gauge Superintendent, worked on replacing the old Gargrave's track pins on the trestle track with new ones.  Unfortunately, our stock of new track pins is near depleted and we'll have to clean the old ones before final assembly.  Want to insure conductivity thru the pins even though we're soldering all joints.

Ted's Big Boy reappeared.  Checked clearance on some cars at the NW corner curve between tracks 1 and 2 (an area where the curves were relocated).  Cars were short and had no problems but the track spacing gradually decreases to 4 inches at the beginning of the trestle and may cause some problems with the Big Boy.  At the other end, coming into the trestle on track 1, have a big clearance problem with the Big Boy, so can't run it in that direction.  Running it out of the trestle at that end was not a problem.  At the NW end, coming into the trestle, there is interference with the vertical support.  This will be eliminated with a redesign when the flat area is installed.

Started to layout and cut the plywood for the elevated flat area at the NW corner.  Thru a minor miscalculation, the plywood was too long and was recut.  Unfortunately, the recut was also a tad too long (the upper right hand corner in the pic).  Decided to call it quits since it was getting late and my right knee was acting up making it uncomfortable to stand or walk.

2018-01-13 001

Two museum guests visited hoping to tour the museum but the museum was closed.  They are past residents of Lakewood.  We had some historical discussions about the building and Lakewood.  Ted gave them a cook's tour of the dungeon.

 

Attachments

Photos (1)

Bud,

I hear you on the ice age ending, monsoon, then the next ice age; with a sizable amount of snow preceding it too!  What a mess here in Western Pennsylvania!

I'm glad to see that I am not the only one who measures twice and still cuts it wrong twice!  Oh well, as the barber back in teenage days used to say, "I can take more off, but I can't put it back on."  Also, as a former supervisor used to tell us, "when things are going wrong or you can't figure out what is causing the problem, walk away from it, get a cup of coffee, and come back later to readdress it."  

Having met Ted at York, I think he would be a great tour guide!  Knowledgeable and Personable!!

We are back up and running again as a club and back "working on the railroad". While Bud is doing all his wood cutting, we will be proceeding on the final painting in the hallway so we can re-hang our pictures there and get that area completed. One part of our club said they would paint the hallway but never finished so the more active ones are going to get it done.

Next up is to clean up the other part of the hallway for the benefit of the museum people who are in the process of restoring the original science lab room. We work with them restoring the basement area so it looks presentable.

Ted Bertiger, President

Ocean County Society of Model Railroaders Lakewood, N.J.

www.ocsmr.com

 