UPDATE #12

It’s been a very productive day all thanks to the recent air conditioner installation. I find myself really letting time get away from me but that’s fine because I’m beyond pleased with the outcome thus far.

I realized now that with the I second level being raised higher, I was able to adjust the placement of the entire second level which will add much needed space for scenery and better looking cliffs. By doing this, I needed additional support for the homasote piece I cut out from the first level, so I grabbed a sheet of plywood for the second level. I taped out the cuts for a better visual.
0B5416F5-DED5-408C-8CB1-51C2548C6723

Followed up, I took a jigsaw to the plywood, of course after I covered everything.(Didn’t capture any photos during this process) Next up the support legs for the second level were added and secured. Each screw was labeled underneath to make any future changes/demolition easier.
D37EF64D-3785-4648-B4EB-252D23CD2E29

Finally, I placed the third level back in place just for more visual reference’s. I’m really happy with the progress and all the little adjustments I keep doing that keep improving the layout.
8A52EE0C-203A-43E4-922C-152A04EB4ADA49C93930-509F-404A-8BFA-283C7F95BA748707F102-EB5E-4333-9ED1-67A874D12D7C952F11DD-E6BD-4C52-B541-DECE0A29FC625C85C3BF-21ED-466C-9BE7-4DF51BD43002

Attachments

Images (7)
  • 0B5416F5-DED5-408C-8CB1-51C2548C6723
  • D37EF64D-3785-4648-B4EB-252D23CD2E29
  • 8A52EE0C-203A-43E4-922C-152A04EB4ADA
  • 49C93930-509F-404A-8BFA-283C7F95BA74
  • 8707F102-EB5E-4333-9ED1-67A874D12D7C
  • 952F11DD-E6BD-4C52-B541-DECE0A29FC62
  • 5C85C3BF-21ED-466C-9BE7-4DF51BD43002

KEEPING INVENTORY

With the paint still fresh from yesterday, I’ve decided to start the daunting but necessary task I’ve seen discussed numerous times on this forum, the task of keeping an inventory list. It’s a perfect time for me to start doing this considering this past January I just started getting back into the hobby. So I got a notebook with graph paper and drew up my own spreadsheet’s, one category for Structure Inventory and another for Train Inventory. Next up is the fun part of filling it in!A78E3DCC-16D5-4222-8D32-60E889A24FB2E020C13B-AA82-48E7-822F-575E5320629E

Attachments

Images (2)
  • A78E3DCC-16D5-4222-8D32-60E889A24FB2
  • E020C13B-AA82-48E7-822F-575E5320629E

Inventory Update - Structures

Finished up the inventory spreadsheet for the 34 structures I currently have. I know I can get the plasticville dates, as for the rest, I’m missing the dates manufactured and the original MSRP. Any leads on obtaining these would be greatly appreciated! I know they’re not necessary but I’d still like to have the information.
B4C3FF9D-C40B-403D-8E10-82759481C404C2469813-019E-43BC-994C-7491C975EB12

Attachments

Images (2)
  • B4C3FF9D-C40B-403D-8E10-82759481C404
  • C2469813-019E-43BC-994C-7491C975EB12

NEW PURCHASE UPDATE!

I made my first visit to the Renningers Flash Train Meet in Kutztown, PA this past Saturday.  Awesome show with a much bigger selection than I was expecting. There’s also several other vendors there for the Farmers Market so lots of foods, crafts, antiques, etc. for everyone. Anyway, I picked up this K-Line PRR boxcar in near excellent condition. I know, nothing special but it’s my first PRR boxcar. I’m definitely keeping these Renningers Flash Train Meets marked on the calendar. They hold a few each year.
508324DB-AF53-4611-9C98-73886419FAC2

Next up I grabbed a RH 022 switch with controller from a LHS that’s specializes in HO but have a decent O selection. I also did a combined deal on eBay which really dropped the price on 2 more sets of 022 switches, one set with controllers and one set without. Grabbed a small bag of reproduction coal as part of the bundle deal too.
BDA6DAA8-4DBD-4B1A-BEBA-5D5E6BED1E2C
333ACD27-9C8C-4F81-9626-BD2B0844FB31

Off to clean these 022 switches up!

Attachments

Images (3)
  • 508324DB-AF53-4611-9C98-73886419FAC2
  • BDA6DAA8-4DBD-4B1A-BEBA-5D5E6BED1E2C
  • 333ACD27-9C8C-4F81-9626-BD2B0844FB31
Last edited by Richizzle07

UPDATE #14

I’ve completed the service/cleaning of the switches I recently purchased. Here’s some photos of the before and after with the slides being cleaned. DC41F540-C342-4428-9075-FE6AB2224D986BAC562A-F9DD-4EAF-AE76-D199A2414B88482A9AE1-4BF0-490A-AE1C-F8E88F48E90864ADA397-668D-4644-B2C9-ECECFBEAB77E

Finally came across a switch with the non derailment feature not working. Actually it was two of the RH switches that needed the joints soldered. This was my first time soldering in over 20 years. C2104B85-4A99-478C-975C-4C15067D83E5

I also cleaned up some short sections of track and a bunch of track pins. The track to the right has been cleaned up compared to the left piece.E10A6066-A93C-43BF-830B-D680224B4C5B46838EBF-B3DA-4750-900C-CDA2530A5F9850793901-A60E-42C9-A012-C5C5E5B01481

Now I just have to swap out one of the RH switches I’ve already had on the layout. Reason is the one track has a slight bend in it and it’s causing a bump to occur. I’m also reading up on the fixed voltage feature since I’ve only ever used track power.

Attachments

Images (8)
  • DC41F540-C342-4428-9075-FE6AB2224D98
  • 6BAC562A-F9DD-4EAF-AE76-D199A2414B88
  • 482A9AE1-4BF0-490A-AE1C-F8E88F48E908
  • 64ADA397-668D-4644-B2C9-ECECFBEAB77E
  • C2104B85-4A99-478C-975C-4C15067D83E5
  • E10A6066-A93C-43BF-830B-D680224B4C5B
  • 46838EBF-B3DA-4750-900C-CDA2530A5F98
  • 50793901-A60E-42C9-A012-C5C5E5B01481

You may well need some extra real estate with your building boom.

One such late member here had me build a  ultra light weight 2' X 8' non RR corner module for his train room just for his structures.   I believe his handle was Pennsy k-4.   This had no track, just n assortment of buildings in a corner  opposite his layout.

The lower cut out shelf was for a power pack to handle the lighting.

This was fabricated to fit between two door frames and the curved edge allowed natural traffic flow between door ways.

Thursday 10 PM 002Just an idea.

EDIT,  A few fabrication shots:

This was built to be a home display positioned in place with square brass dowels from Freeman mfg co.    Male on the chair rail frame, female on the module bottom.

winding down over view 004

Another consideration was to have temporary screw on legs for train show display purposes.

winding down over view 002



7 wood shots 0027 wood shots 003Handles to carry in for show set up.7 wood shots 005Perimeter slots for removable backdrop7 wood shots 007Augustineous Rex 003

Attachments

Images (9)
  • Thursday 10 PM 002
  • 7 wood shots 002
  • 7 wood shots 003
  • 7 wood shots 005
  • 7 wood shots 007
  • Augustineous Rex 003
  • winding down over view 002
  • winding down over view 004
  • winding down over view 002
Last edited by Tom Tee

Thanks for the ideas @Tom Tee! Beautiful craftsmanship! I’m planning on having a few lightweight lift out sections along the walls in the back. They will only have buildings and scenery on them for the second and third levels. The square dowels will definitely help with keeping these lined up. The rest of the room has furniture along the walls so no more expansions along walls, for the time being🤔. I am considering adding a piece on each front corner just to expand my corner real estate. The work I’ve seen shared by you is quite remarkable! Thanks again!

You are welcome.  The dowels I use are the #4.  Make sure you get the Freeman male/female tool that perfectly fits that size dowel.  It is the best way to get a good installation.  Also spot face the area first with a Forstner bit so as to recess the mounting flange.  Use the Forstner pilot hole to start your through hole.   I find a  jig to maintain a plumb drill center line helpful.

Freeman Manufacturing   contact  440.934.1902

Last edited by Tom Tee

UPDATE #15

The past 2 days I’ve bounced around getting a few different things done.


The main project I worked on was measuring, cutting, and glueing of the foam roadbed on the closet extension I recently added.C464FE86-2D4D-48FA-8826-8C6F545F374FAAFB6FDD-3E48-4407-853E-456AFA1BA247F66D4289-F37E-461E-B82F-4DD43AF0E0D8FAC290EB-4C8C-4D2A-881A-3F3BB328DAC8

While I was waiting for the glue to dry, I cut two plywood pieces and installed them underneath the benchwork. These will have power supplies, terminal strips, dimmers, etc. 07C326F1-8395-4959-95B0-BEB53C717A73C828A6D3-0780-4156-A85F-082107C9AC2F

I also cut out a piece of plywood and installed it for the base of the stream/waterfall. I even cut out some blue craft paper for water. A2F7ADEF-A3F8-4442-AD8B-6A5AF23A005D5EDB8FE8-E21C-40AF-B3CD-EBB9230E8C43

Final few things I got to do was put down the track on the extension (not secured yet), swapped out the one 022 RH switch, and was able to open up some of my purchases from York!!! It was like Christmas in July on this 97 degree day (real feel of 103 degrees!). I placed the MTH PRR double engine shed and the MTH passenger station with dual platforms. AF619D36-1FD7-4104-BB34-1366AF1BE1EA973F5E8F-A376-42D5-B568-BEC007AF6B5B

It’s all starting to really come together!! More updates to come! Happy Railroading everyone!

Attachments

Images (10)
  • C464FE86-2D4D-48FA-8826-8C6F545F374F
  • AAFB6FDD-3E48-4407-853E-456AFA1BA247
  • F66D4289-F37E-461E-B82F-4DD43AF0E0D8
  • FAC290EB-4C8C-4D2A-881A-3F3BB328DAC8
  • 07C326F1-8395-4959-95B0-BEB53C717A73
  • C828A6D3-0780-4156-A85F-082107C9AC2F
  • A2F7ADEF-A3F8-4442-AD8B-6A5AF23A005D
  • 5EDB8FE8-E21C-40AF-B3CD-EBB9230E8C43
  • AF619D36-1FD7-4104-BB34-1366AF1BE1EA
  • 973F5E8F-A376-42D5-B568-BEC007AF6B5B



973F5E8F-A376-42D5-B568-BEC007AF6B5B

Question: What is on the other side of the closet rear wall?

Can those two tracks tunnel through for an GRJ style yard or perhaps additional mainline?

Maybe a reverse loop?

Maybe just a shelf for one or two display sidings.

On one particular job we moved all the furniture 6" away from the wall and ran skinny modules around the room.   Just thinking out of the box...

Due to the rather short siding tails, another consideration,  cut out a hole in the wall using a tunnel portal opening as a pattern for cutting out the wall board.  Paint the hollowed out portion of the cavity flat black.    Adhere the tunnel portal in place.  Then you will have picked up a classy  4 extra inches of track for both sidings.

Last edited by Tom Tee

@Tom Tee I would love to do that but on the other side of that wall is a bedroom that the RR just can’t obtain rights to. It’s been proposed, but quickly shot down. I am planning on doing 2 little tunnel portals. They won’t be cut into the wall though. I eventually have plans to run the third level dog bone into the closet. I did want to replicate the Tunkhannock Viaduct (Nicholson Bridge) but I just simply don’t have enough room for the supports. I’m looking into other bridge options now.

NEW PURCHASE UPDATE!

I took a trip up to Grzyboski’s for my monthly visit. Now that I think of it, I might be visiting two times a month but oh well😂.

First up is a boxcar I’ve been wanting for some time now. Introducing the I Love Pennsylvania boxcar from Lionel. It’s used but in great shape, even with the box. 7ECD8F9F-FF66-41C3-BA4D-4EB3E097A3DE

Only other thing I grabbed on this trip was a Lionel branchline water tank. I now have two for different layout levels. 04DADCDF-4137-4825-825B-74D44A90A881

Attachments

Images (2)
  • 7ECD8F9F-FF66-41C3-BA4D-4EB3E097A3DE
  • 04DADCDF-4137-4825-825B-74D44A90A881

Thanks @Mark Boyce! They still make their way to York, all the more reason to make it! Even with them being about 20 minutes up the road from me, I purchased off them at York 😂. As for the limited space, I’m trying to go with a vertical approach by having 3 layers. It’s going to allow for more stuff IMO, well that’s the plan at least. It will also help with breaking up the different scenes. I’m very pleased with the closet extension. It doesn’t look like much real estate, but it’s really adding so much more.

Last edited by Richizzle07

Vertical sometimes is our best hope.  The late Donnie Grant of New Castle taught me that 26 years ago when I was just getting back into 0 scale in a modest size train room.

We are presently working on a new children's display layout build with five levels reaching almost to the ceiling.   Just now working on the upper mountain zone before it I build it out of reach.

There is a two track main running around the large "L" shaped layout then an elevated line running around the platform.  The next two levels are simple oval loops and then the mountain line.

Don 5 levelsThe top 8' bridge R.O.W. runs around the room.

Attachments

Images (1)
  • Don 5 levels
Last edited by Tom Tee

John, I believe that most of us all are blessed with being grown up kids.  Not too sure about the grown up part for us'ins.

These kids have five loops, you have five loops.  Same same 'ceptin you are taller.

Rich,  How about it?  Want to join the five level or five loop crowd?  Another top level and then a subway will get you into the club.

Last edited by Tom Tee

@Richizzle07 Rich just found this thread and read through the entire 3 pages.

You sure moved fast on tear down and building up. I like the use of the closet space. You have a ton of buildings for a small area! I believe your dad would be proud of what you've done and will do.

BTW sorry to hear about Dream. Same age our Siberian huskie Nakita was when we had to put her down.

@Richizzle07 posted:

hmmmm now, for four.  The subway will bring you up to you have me thinking🤔😂. I might be able to put a lifted trolley on the top level. Would that count?

Sure would count, for four.

Adding the subway also will bring you up to the five level or loop club.

Maybe we should  a take a census establishing a charter for the "5 or 5 club".  I am in with five +.

Thank you @RJ Shier for the compliments and all the kind words. If you can believe it, there’s a few more buildings/structures I’m interested in getting. A Siberian Husky is in the same category that Dream was, a northern dog so they absolutely love the cold. They’re both enjoying that snow mountain in the sky now. Again, thanks for all the kind words, it’s greatly appreciated!

Last edited by Richizzle07

UPDATE #16

Only a few minor updates to report on the layout. I secured all the remaining track on the first level in the area of the closet extension. I once again used zip ties to help prevent with the sound being transferred into the plywood. AD1E322E-208C-4060-87AC-7A96D27AAA119E732FA3-0A11-404F-B5AD-92F118B01B69

As you can see in the first photo above, I also drilled and installed the feeder wires for the track power. Added a few more since I’m going to have isolated track sections throughout the yard extension. At the end of the yard I simply installed spade connectors in the tracks and draped the feeder wires over the back edge in the closet.D2C60009-491B-47B2-BB48-3E10A35D3314B52039F5-233B-41AA-9DF5-C7C9416645D7

More updates to come down the line! Happy Railroading Everyone!

Attachments

Images (4)
  • AD1E322E-208C-4060-87AC-7A96D27AAA11
  • 9E732FA3-0A11-404F-B5AD-92F118B01B69
  • D2C60009-491B-47B2-BB48-3E10A35D3314
  • B52039F5-233B-41AA-9DF5-C7C9416645D7