Skip to main content

I had bought a few of these when they came out. Three to be exact. I am going to be using two of them for small steam facilities. One on my attic layout and the other for the switching layout I started in the basement. The question I am throwing out is could I possibly use the third one for some type of loading facility other then coal say like maybe a Portland Cement loading tower. Any ideas are greatly appreciated. Thanks Paul

Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×