Skip to main content

Worked on a team track area.  Laid down 3/16" foamcore that I had as scrap pieces, these were placed between outer mainline and siding tracks, and siding track to table edge.  The wooded ramp was something I scratched together for my old Fastrack layout so had to factor in height difference for Atlas.

20180302_133724

Picked up another piece of 3/16" foamcore from Hobby Lobby, cut and glued onto first layer to bring to top of rails on siding, which is a bit lower than mainline rails as no trackbed.

20180302_163025

I beveled the foamcore edges that butted against track to get a better fit.  Here's a test piece for example.

20180302_133829

I'll "pave" over top of the foamcore with some joint compound, then paint to get an aged concrete look.

Attachments

Images (3)
  • 20180302_133724
  • 20180302_163025
  • 20180302_133829

I just looked through the last two days worth of activity!  Wow, what a person can miss when not online a couple of days!  I put a bunch of likes in, so for those that got them, I really do like your work or comments.  I do have a couple comments.

Brian, could you run that CP passenger train a little faster please, I was still able to glimpse a bit of color there in the blurr!  

Paul2, I like the Fast Loans sign a lot!  Miller Engineering signs are wonderful, but I think your sign is of a much more common sight for days gone by!

As far as electrical goes, the place I have had to be most cautious was in the 500KV substations tuning the LC circuit at the base of the wave trap out in the yard.  We would do our testing hot.  Usually I was in the control house or a cabinet, and the voltages were 125VDC up to 60A, and 240VAC and I forget what they were fused.  However, the annual test of the transmission lines included testing and tuning the LC circuit.  We were only a few feet below the tap off the transmission line; 115KV, 230KV, and 500KV.  You had to disconnect a tap and test.  If you stood too tall, you could risk getting into 500KV, fortunately the current was stepped down, but still...  Anywhere in the 500KV switchyard, you could hear the crackling of static, especially if it was humid.  The static wouldn't hurt you, but it would let you know it if you opened a cabinet door without wearing gloves.   It's been over 20 years since I did that kind of work.  I prefer the lower voltages in telecom where I have been the last 21 year, and even better engineering sitting at the desk now near the end of my employment days!!  

I was going to start cutting my Homasote for my roadbed, but it is extremely windy today, so I started working on the shelf part of my layout instead.  I had to move the 18" metal wall brackets up 4 inches to get a match for the height of the roll around.  Then I put stringers on the two I did and a fascia board on matched to the roll around.  I could clamp the roll around to the stationary part, but it is fine for now with the brakes set.  I think it is going to work pretty slick.  Here are two photographs.  My carpentry skills aren't very pretty nor is my used wood, but it all seems solid enough.  I still need to put an 8 inch section between the wall and the tabletop, but that material is out in my shed, and I was afraid I may blow away.  I thought the dog may fly like a kite at the end of her cable when I put her out.  LOL

2018-03-02 14.24.442018-03-02 14.24.58

Attachments

Images (2)
  • 2018-03-02 14.24.44
  • 2018-03-02 14.24.58
Last edited by Mark Boyce
Mark Boyce posted:

I was going to start cutting my Homasote for my roadbed, but it is extremely windy today, so I started working on the shelf part of my layout instead.  I had to move the 18" metal wall brackets up 4 inches to get a match for the height of the roll around.  Then I put stringers on the two I did and a fascia board on matched to the roll around.  I could clamp the roll around to the stationary part, but it is fine for now with the brakes set.  I think it is going to work pretty slick.  Here are two photographs.  My carpentry skills aren't very pretty nor is my used wood, but it all seems solid enough.  I still need to put an 8 inch section between the wall and the tabletop, but that material is out in my shed, and I was afraid I may blow away.  I thought the dog may fly like a kite at the end of her cable when I put her out.  LOL

2018-03-02 14.24.442018-03-02 14.24.58

Looks good Mark!  You should take the "carsntrains" building course.     Build it.   Then make a plan lol   Its fun!!! : ) 

Jim 

Blood, Sweat and Tears

Let's take these three in reverse order.

Tears

For the most part I'm done with tears. I left those behind a long time ago. When I was about 8, my prize piece of Lionel was the O gauge milk car, the one with the brown roof. My layout, on an old ping pong table, had a graduated trestle set climbing a long straightaway and an 027 curve at the bottom, on the far side from the controls. Somehow the milk car got away. It didn't fly so much as plummet. To this day, it still has a broken door from that incident. 

The last time I cried over trains was 25 years ago, when I had to close enterTRAINment.

Sweat

That's just standard. I'm sure I've given gallons of it over the years.

Blood

Unfortunately, there has been more of that than I care to give. Most recently was on Tuesday. I needed to get back into this corner and pop up in my access hole, so I could finish painting the rail. I had finished painting and went to get out. I ended up sliding out on my left side. Big mistake. See the blood on the floor?

IMG_8179

I showed it who was the boss yesterday, and lopped off the offending corner. Then covered the edge with a scrap of carpet.

IMG_8194

It is almost a joy getting in and out of there now.

IMG_8193

I went back in there three times, and finished ballasting

IMG_8191

Work day again tomorrow. Got some goodies from Scenic Express today, including the rest of the pieces for my viaduct. I do need to finish ballasting the Northtown bowl tracks though.

 

Attachments

Images (5)
  • IMG_8168
  • IMG_8179
  • IMG_8194
  • IMG_8193
  • IMG_8191
paul 2 posted:

Still just little things. I needed to take up some cork because I didn't draw a center line through the grain elevator so when I measured for that I found that I had to take up cork and move it over, I spent the next twenty minutes or so looking for my Chisel. I finally found it but to my surprise in looking for it I found the assembly directions to the Pawn Shop under a pile of stuff. But still thanks to those that help me. And it is a short day. I have to get my stuff ready for the train show at the Independence High School Fieldhouse tomorrow 6001  Archwood rd Independence OH. It is from  10 AM to 3 PM Saturday March 3rd. But I am heading up there tonight to set up so I don't have to get up early and do it tomorrow. I got the lettering cut out for the sign, that's a slow process. And then I glued them to the sign frame. After it dried a bit I placed it on the roof. Then I went back to laying cork. All the cork is down. It probably won't be till Sunday that I can work on the layout again. Pics.......................Paul

DSCN1562DSCN1567DSCN1566DSCN1565

 

Looks good Paul! I hope you have fun at the train show! Buy something nice! LOL

Mark, things are looking nice! What the wood looks like doesn't matter, FREE is always good!

Elliot, your track painting looks wonderful along with the ballast! Sorry you got cut, but I am glad you took care of that no good corner! I hope today is going to be a better day and you have fun with what ever you have planned for the layout!

Deuce, I don't see anything wrong, remember its your layout, make it as you want it! There are to many things building a layout that can test your sanity! So just have fun!

Mark- the wood will all get covered up with scenery so as long as its solid its good. I never did any sub-station work but that crackle is a sound you never forget. Seen my share of transformer failures though.

Elliot- we have all bled for our railroads at one time (or more than once)

Deuce- flashing lights are the best. No worries that they are not realistic to the train movements. Plenty of time for that when your kids are older and you build a more serious layout.

Paul- Have fun at the show today.

Hey Mike- You framin' or surfin'????

Big storm blew up the east coast yesterday. Hope everyone made it through OK.

Bob

briansilvermustang posted:
mike g. posted:

To be honest, sometimes it's self gratifying to look back and say I did that by myself, other times it sure would be nice to have another set of hands!

Nice try Brian, that would work for beer drinking, but not to have someone at the other end of a beam! LOL

mike g. posted:

Bob, side question, since you know electrical, how many outlets can I put on 1 20 amp breaker?

Mike- no maximum by code. when I used to wire houses I would average 8-10 receptacles on 15 amp circuits. For 20 amp circuits that would be fine. Really depends on what you plan to plug in. I would recommend one or two dedicated 20 amp circuits for the trains and then a separate circuit for convenience outlets around the room. Lighting can have it's own 15 amp circuit too.

Bob

RSJB18 posted:
mike g. posted:

Bob, side question, since you know electrical, how many outlets can I put on 1 20 amp breaker?

Mike- no maximum by code. when I used to wire houses I would average 8-10 receptacles on 15 amp circuits. For 20 amp circuits that would be fine. Really depends on what you plan to plug in. I would recommend one or two dedicated 20 amp circuits for the trains and then a separate circuit for convenience outlets around the room. Lighting can have it's own 15 amp circuit too.

Bob

Thanks Bob, I sent you an Email as not to hijack the topic here! The only thing goin to be plugged in is Z4000 and some other train stuff. and that it. This new room is for Trains stuff only!

Deuce posted:

The littlest came out to watch today. I could see the wife taking a mental tally of everything on the table. Good thing she didn't look underneath! Ha ha ha.

20180303_142238

Deuce... my office is the 2nd floor of a barn we used to live in until we finished building the house.  As long as my wife doesn't snoop around a closet up there I think I'm okay for the time being!  And she's out for 4 days with my daughter at the end of this month so that'll be my time to add 60 more square feet of tables for my layout with my 5 year old son.  If my track arrives then we'll lay some rail too!

looks GREAT Mike    bet your ready for them 4 beers now...

                                                               oops, make that 5...    1 for the inspector...

                           getting CLOSER !!!  pull out a chair, and grab a cold one !!

                         I can see one of these parked on the siding by the brewery...

 

Attachments

Images (2)
  • mceclip0
  • mceclip0
Last edited by briansilvermustang

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×