I haven't posted recently on my progress on redoing my layout because there wasn't much to see.
While there is still no major visible progress, I thought I would post a few photos.
This is my temporary work area. It will eventually be the end of my yard.
![20230823_164633 20230823_164633](https://ogrforum.ogaugerr.com/fileSendAction/fcType/0/fcOid/12129987997660671/filePointer/177257758625622814/fodoid/177257758625622805/imageType/SMALL/inlineImage/true/20230823_164633.jpg)
Here are 2 photos showing the track being roughly laid out along 2 of the 4 sides of the around-the-room layout.
![20230823_164732 20230823_164732](https://ogrforum.ogaugerr.com/fileSendAction/fcType/0/fcOid/12129987997660671/filePointer/177257758625622815/fodoid/177257758625622806/imageType/SMALL/inlineImage/true/20230823_164732.jpg)
![20230823_164834 20230823_164834](https://ogrforum.ogaugerr.com/fileSendAction/fcType/0/fcOid/12129987997660671/filePointer/177257758625622817/fodoid/177257758625622808/imageType/SMALL/inlineImage/true/20230823_164834.jpg)
My train room computer with my Lionel clock.
![20230823_164755 20230823_164755](https://ogrforum.ogaugerr.com/fileSendAction/fcType/0/fcOid/12129987997660671/filePointer/177257758625622816/fodoid/177257758625622807/imageType/SMALL/inlineImage/true/20230823_164755.jpg)
Here are the 2 boards I have prepared for power output from the transformers going through chokes, fuses, TVS and connecting to the TIU's (using passive, super-TIU mode). The boards are back-to-back under the layout behind the stand for the transformers.
![20230824_152615 20230824_152615](https://ogrforum.ogaugerr.com/fileSendAction/fcType/0/fcOid/12129987997660671/filePointer/177257758625622818/fodoid/177257758625622809/imageType/SMALL/inlineImage/true/20230824_152615.jpg)
![20230824_152718 20230824_152718](https://ogrforum.ogaugerr.com/fileSendAction/fcType/0/fcOid/12129987997660671/filePointer/177257758625622819/fodoid/177257758625622810/imageType/SMALL/inlineImage/true/20230824_152718.jpg)
A ZW-L supplies 4 channels of power to 1 board, and a ZW-C with 4 bricks supplies power to the other board. It's a little overkill, but I use a refurbished postwar ZW to power accessories.
I have just started dragging 12 gauge wire from these boards to where they will connect to 16 gauge wire for the final connection to the track sections.